MATERIAL HANDLING • WAREHOUSE • INDUSTRIAL 516.987.8437mark.keeling@indoff.com
PUBLISHED INDOFF CASE STUDY

C.B. Sullivan Company

C.B. Sullivan Company had run out of space for small-item storage and was using pallet rack locations for multiple SKUs, requiring high-reach lift trucks for order picking.

8,300 sq. ft. Cogan mezzanine
Installed over existing pick line
Strategic column placement

The Challenge

C.B. Sullivan Company had run out of space for small-item storage and was using pallet rack locations for multiple SKUs, requiring high-reach lift trucks for order picking.

The Approach

Indoff proposed an 8,300-square-foot Cogan mezzanine. Cogan engineering field-measured the site, and columns were positioned between flow-rack sections, within existing shelving and outside conveyor lines. The distribution center remained operating during installation.

The Outcome

The published Indoff case study reports increased floor and storage space, cleared pallet locations for full pallets, reduced reliance on picking trucks and a more streamlined picking operation.

How I Can Help

I work as your single point of contact to help evaluate the application, coordinate manufacturers and products, and manage the project from planning through implementation.

Have a similar project?

Let's talk about your facility, goals and next steps.

CONTACT MARK →

Source: Indoff published C.B. Sullivan Company case study.